Robot atau manusia?
CNC / injection machine tending
Operator loading and unloading a machine vs Cobot machine tending cell
Estimasi model Whirrwork, bukan fakta. Metodologi · Rekam jejak
On these numbers the robot option is clearly cheaper.
Amerika Serikat · USD · BLS OEWS May 2025 national medians by SOC occupation
Hitung dengan angka Anda
Change anything. Results update as you type and stay in your browser; nothing is stored or sent. Works offline after your first visit.
Hasil
| Opsi | Per bulan | Per tahun | Per unit (tending hour) | Biaya awal | Masa balik modal | Break-even utilisation | 5-year NPV vs baseline |
|---|---|---|---|---|---|---|---|
| Manusia Operator tending Pembanding | US$9.970 | US$119.635 | US$28,32 | — | — | — | — |
| Robot Buy a cobot cell | US$3.794 | US$45.523 | US$10,78 | US$81.314 | 11 bulan | 17% Utilisation 98% |
US$322.817 |
| Robot Robot by the hour (RaaS) | US$6.225 | US$74.698 | US$17,68 | US$40.000 | 9.2 bulan | 13% Utilisation 98% |
US$204.283 |
What moves the answer most
Each bar shows the 5-year NPV of the best robot option when one input moves to the low or high end of its range, with the rest held at your values.
Cost per unit to 2035
Real terms (today's money). Robot hardware follows Wright's law; wages follow each country's history. Shaded band: robots-slow to robots-fast scenarios. Estimasi model Whirrwork, bukan fakta.
Tahun titik temu biaya: sudah
What the spreadsheet misses
- Keselamatan
- Removes repetitive reaching into machines; risk assessment is still required for cobots.
- Kualitas
- Consistent load positions; fewer scrapped parts from mis-seating.
- Fleksibilitas
- High-mix, low-volume shops pay for every changeover.
- Edge cases
- Chips, coolant and parts that tangle defeat grippers.
- Customer experience
- Lights-out second shifts shorten lead times.
- Jobs and redeployment
- Operators become cell technicians; the evidence on robots and local employment is mixed and depends on sector (see our insights).
- Regulasi
- ISO 10218 and ISO/TS 15066 for collaborative operation; CE marking in the EU.
Terkait
- Mesin yang merawat (pemuatan CNC) Prices and providers for this job
- Essay: when robots beat humans on cost
- Proyeksi
- Metodologi
- API and MCP tool
- Research hub
Sumber di halaman ini
Catatan dan sumber berbahasa Inggris; versi bahasa Inggris menjadi acuan.
- Universal Robots UR5e cobot arm $39,083-$43,544 (US distributor listing) Automation Distribution, 2026-10 · vendor
- Cobot welding price breakdown: integration/commissioning $15,000-$40,000; base system 50-60% of total investment; maintenance 3-5% per year THG Automation (integrator), 2026 · vendor
- RaaS machine tending: six-axis robot at about $10 per hour (Formic) Plastics Machinery & Manufacturing, 2026-10
- Occupational Employment and Wage Statistics, May 2025 (median hourly wage by occupation) U.S. Bureau of Labor Statistics, 2025-05
- Employer Costs for Employee Compensation, June 2026: wages and salaries 70.0% of private-industry compensation (series CMU2020000000000P) U.S. Bureau of Labor Statistics, 2026-06
- Mean nominal hourly earnings of employees by sex and occupation (ISCO-08), DF_EAR_EHRA_SEX_OCU_CUR_NB ILOSTAT (International Labour Organization), from national labour force and earnings surveys, 2025
- Labour cost levels by NACE Rev. 2 activity (lc_lci_lev): Germany 2022-2025, total labour cost vs wages and salaries per hour Eurostat, 2025
- Rates and thresholds for employers 2025 to 2026 (employer Class 1 NIC 15% above £5,000) HM Revenue & Customs, 2025-04-06
- 令和6年賃金構造基本統計調査 (Basic Survey on Wage Structure 2024), table 1 by occupation Ministry of Health, Labour and Welfare, Japan (via e-Stat), 2024-06
- Average monthly earnings of employees by sex and economic activity, DF_EAR_EMTA_SEX_ECO_CUR_NB ILOSTAT (International Labour Organization), 2022
- Average annual wage of employed persons in urban units in 2024 (by position and by region) National Bureau of Statistics of China, 2025-05-20
- Euro foreign exchange reference rates (cross rates to USD), via Frankfurter European Central Bank, 2026-10-23
- Wright, T. P. (1936). Factors affecting the cost of airplanes. Journal of the Aeronautical Sciences, 3(4), 122-128 Journal of the Aeronautical Sciences, 1936
- Nagy, B., Farmer, J. D., Bui, Q. M., & Trancik, J. E. (2013). Statistical basis for predicting technological progress. PLoS ONE, 8(2), e52669 (62 technologies; Wright's law among the best hindcasters; errors grow with horizon) PLoS ONE, 2013