机器人还是人工?
Window and facade cleaning
Rope-access or lift crew (contract) vs Cleaning-drone service
人工 · 每年US$150,000Rope or lift contractor
机器人 · 每年US$54,000Drone cleaning service
回收期immediate
成本交叉年份已经Base-case year (earliest to latest across scenarios)
On these numbers the robot option is clearly cheaper.
美国 · USD · BLS OEWS May 2025 national medians by SOC occupation
用你自己的数字计算
Change anything. Results update as you type and stay in your browser; nothing is stored or sent. Works offline after your first visit.
结果
| 方案 | 每月 | 每年 | Per unit (sq ft) | 前期投入 | 回收期 | Break-even utilisation | 5-year NPV vs baseline |
|---|---|---|---|---|---|---|---|
| 人工 Rope or lift contractor 比较基准 | US$12,500 | US$150,000 | US$1.25 | — | — | — | — |
| 机器人 Drone cleaning service | US$4,500 | US$54,000 | US$0.45 | — | immediate | — | US$416,012 |
| 机器人 Run your own cleaning drone (subscription) | US$6,961 | US$83,532 | US$0.696 | US$5,000 | 0.9 个月 | 2% Utilisation 6% |
US$299,089 |
What moves the answer most
Each bar shows the 5-year NPV of the best robot option when one input moves to the low or high end of its range, with the rest held at your values.
Cost per unit to 2035
Real terms (today's money). Robot hardware follows Wright's law; wages follow each country's history. Shaded band: robots-slow to robots-fast scenarios. Whirrwork 模型估算,并非事实。
成本交叉年份: 已经
What the spreadsheet misses
- 安全
- Takes people off ropes and lifts for routine washes, the main reason buildings try it.
- 质量
- Soft-wash rinsing is not squeegee-clean glass; ask for before and after photos.
- 灵活性
- Rope teams also inspect sealant and fix things.
- Edge cases
- Wind, tall towers, dense downtowns and airspace rules limit drones.
- Customer experience
- Tenants prefer not having a person at the window.
- Jobs and redeployment
- Rope access shifts toward inspection and repair.
- 法规
- Drone pilot certification (FAA Part 107 or local equivalent), tethered-flight and water-runoff rules apply.
相关内容
- 高层玻璃幕墙清洗 Prices and providers for this job
- 无人机高压清洗 Prices and providers for this job
- Essay: when robots beat humans on cost
- 预测
- 方法说明
- API and MCP tool
- Research hub
本页来源
说明和来源为英文;以英文版为准。
- Conventional lift/rope exterior cleaning bids $0.50-$3.50 per sq ft (for comparison with drone cleaning) Sky PSI (drone cleaning company), 2026-10 · vendor
- Drone facade/window cleaning, commercial buildings: $0.12-$0.25 per sq ft Vista Drone Cleaning, 2026-10 · vendor
- Lucid Bots Sherpa cleaning drone subscription for operators: $2,950-$4,600 per month Lucid Bots, 2026-10 · vendor
- Occupational Employment and Wage Statistics, May 2025 (median hourly wage by occupation) U.S. Bureau of Labor Statistics, 2025-05
- Employer Costs for Employee Compensation, June 2026: wages and salaries 70.0% of private-industry compensation (series CMU2020000000000P) U.S. Bureau of Labor Statistics, 2026-06
- Mean nominal hourly earnings of employees by sex and occupation (ISCO-08), DF_EAR_EHRA_SEX_OCU_CUR_NB ILOSTAT (International Labour Organization), from national labour force and earnings surveys, 2025
- Labour cost levels by NACE Rev. 2 activity (lc_lci_lev): Germany 2022-2025, total labour cost vs wages and salaries per hour Eurostat, 2025
- Rates and thresholds for employers 2025 to 2026 (employer Class 1 NIC 15% above £5,000) HM Revenue & Customs, 2025-04-06
- 令和6年賃金構造基本統計調査 (Basic Survey on Wage Structure 2024), table 1 by occupation Ministry of Health, Labour and Welfare, Japan (via e-Stat), 2024-06
- Average monthly earnings of employees by sex and economic activity, DF_EAR_EMTA_SEX_ECO_CUR_NB ILOSTAT (International Labour Organization), 2022
- Average annual wage of employed persons in urban units in 2024 (by position and by region) National Bureau of Statistics of China, 2025-05-20
- Euro foreign exchange reference rates (cross rates to USD), via Frankfurter European Central Bank, 2026-10-23
- Wright, T. P. (1936). Factors affecting the cost of airplanes. Journal of the Aeronautical Sciences, 3(4), 122-128 Journal of the Aeronautical Sciences, 1936
- Nagy, B., Farmer, J. D., Bui, Q. M., & Trancik, J. E. (2013). Statistical basis for predicting technological progress. PLoS ONE, 8(2), e52669 (62 technologies; Wright's law among the best hindcasters; errors grow with horizon) PLoS ONE, 2013