Energy & Utilities

Utility vegetation management (LiDAR)

Short answer Published prices for utility vegetation management (LiDAR) run €900–€5,000 per corridor (2 prices from 1 source, France; newest dated Sep 22, 2026). Every receipt is below.

LiDAR surveys of rights-of-way to manage vegetation encroachment.

People ask for this as: “vegetation management LiDAR”, “right of way survey”

Quick facts

Typical published range
€900–€5,000 per corridor
Price receipts
2 prices from 1 source
Who does it
4 providers, 4 sell it as a service
Where
2 countries with a local provider: 🇫🇮 Finland, 🇺🇸 United States

Last updated · Cite this page

How it works

Robots used

  • LiDAR Drone
  • Helicopter LiDAR

Ways to buy it

  • Service — you pay for the outcome (one inspection, one show, X acres).
  • Raas — a subscription covering robot, software and support.
  • Purchase Buy the robot (plus software and service plans, usually).

Bot or Not?

A robot makes sense when…

  • The job is high, dangerous, or hard to reach
  • It is huge or repetitive (acres, nights, square metres)
  • You need data you will compare over time
  • You need eyes on it right now

Hire a human when…

  • It is small, low and one-off
  • It needs hands, judgement or a repair
  • Weather, permits or timing make robots awkward
  • Nobody has defined the job yet

Here's the catch for this job

  • Per-asset pricing (per turbine, per MW) is common.
  • Combine thermal and RGB in one flight to save mobilization costs.

Rules of thumb, not a sales pitch. Take the Ladder Test →

What it costs

Published ranges, each with a receipt. Not quotes: your price depends on scope, location and date. older price = 18+ months.

Embed this chart · PNG · SVG

All 2 receipts as a table
WhatRangeUnitRegionReceipt
Drone LiDAR vegetation-clearance survey of a short power-line corridor (up to 5 km, point-by-point report) (C-DRONE price guide, France, observed 2026 range, excl. VAT)€900–€2,000/ corridorFRc-drone.fr
as of Sep 22, 2026
Drone LiDAR vegetation survey of a long corridor or dense forest (10–20 km) (C-DRONE price guide, France, observed 2026 range, excl. VAT)€2,000–€5,000/ corridorFRc-drone.fr
as of Sep 22, 2026

Dataset: Utility vegetation management (LiDAR) price receipts (Whirrwork). 2 published prices for utility vegetation management (LiDAR), each with its source link and as-of date. Old observations are kept, never overwritten. JSON · history JSON · all downloads · CC BY 4.0

Follow price changes for this job Atom feed: one entry per new or changed price, with its receipt. All feeds

Price history

Only one observation per series so far: we started recording every price on 2026-10-25 and re-check every source on a schedule. A trend appears when a re-checked source shows a different price (we never overwrite old observations).

SeriesLatestObservationsObservedTrendReceipt
Drone LiDAR vegetation-clearance survey of a short power-line corridor (up to 5 km,…€900–€2,000 / corridor1Oct 25, 2026—c-drone.fr
Drone LiDAR vegetation survey of a long corridor or dense forest (10–20 km) (C-DRONE…€2,000–€5,000 / corridor1Oct 25, 2026—c-drone.fr

Append-only: we never overwrite a recorded price. JSON: /api/prices/history?use_case=vegetation-management-lidar

What to specify and ask

Put these in your request and you'll get a real price instead of "it depends":

  1. Corridor length and clearance rules
  2. Outputs (encroachment map, work orders) and vegetation management system
  3. Asset type and count (panels, turbines, km of line)
  4. Location
  5. Access and permits
  6. Deliverables
  7. Outage windows
  8. Frequency

Rules and regulation

Utility work follows NERC/OSHA electrical safety rules; drones near energized lines may need utility approvals; nuclear work needs NRC/IAEA-compliant procedures.

General information, not legal advice. Rules change; ask the operator which permits they hold and verify them.

Providers who do this

Filters by headquarters or published service area.

Phoenix LiDAR Systems

🇺🇸 US Serves global

US maker of UAV LiDAR systems and survey services.

  • Purchase
  • Service
  • Public quote page
  • 5 jobs
  • Oct 25, 2026

NV5 Geospatial

🇺🇸 US Serves US, global

US geospatial services firm including LiDAR and drone surveys.

  • Service
  • Public quote page
  • 6 jobs
  • Oct 25, 2026

Sharper Shape

🇫🇮 FI Serves global

Finnish/US powerline inspection and vegetation analytics company.

  • Service
  • Public quote page
  • 3 jobs
  • Oct 25, 2026

Airpelago

🇫🇮 FI Serves EU

Finnish drone inspection company for powerlines.

  • Service
  • Public quote page
  • 2 jobs
  • Oct 25, 2026

Questions buyers ask

How much does utility vegetation management (LiDAR) cost?

Published prices for utility vegetation management (LiDAR) run €900–€5,000 per corridor (2 prices from 1 source, France; newest dated Sep 22, 2026). Every receipt is below.

Who offers utility vegetation management (LiDAR) near me?

We list 4 providers for utility vegetation management (LiDAR). 2 countries have at least one provider whose own site says it works there; the most covered are Finland (1) and United States (1). 3 providers say they work worldwide. Pick your country on this page to see who serves it, local first.

What should I put in a quote request?

Start with corridor length and clearance rules; outputs (encroachment map, work orders) and vegetation management system; asset type and count (panels, turbines, km of line). The full checklist has 8 items, and a request that covers them gets a real price instead of "it depends".

Do I actually need a robot for this?

Not always. If a competent person with a ladder could do it in an afternoon, hire the person (the Ladder Test). Here's the catch for this job: Per-asset pricing (per turbine, per MW) is common.

Are there rules or permits?

Utility work follows NERC/OSHA electrical safety rules; drones near energized lines may need utility approvals; nuclear work needs NRC/IAEA-compliant procedures. More on rules (a summary, not legal advice).

Cite this page

Whirrwork. "Utility vegetation management (LiDAR): cost, how it works & providers." Last updated 2026-10-25. https://whirrwork.com/use-cases/vegetation-management-lidar/. CC BY 4.0.

BibTeX
@misc{whirrwork_vegetation_management_lidar,
  title = {Utility vegetation management (LiDAR): cost, how it works \& providers},
  author = {{Whirrwork}},
  year = {2026},
  url = {https://whirrwork.com/use-cases/vegetation-management-lidar/},
  note = {Last updated 2026-10-25. CC BY 4.0. Prices link to their original sources.}
}

Quoting a price? Cite its original source too (linked in the table). We're the index, not the origin. Add the date you read this page.

Embed this price card Price card or price chart, free for your site, blog or report. No cookies, no scripts.

Paste this code into any web page. The card shows the typical range with links to its receipts, updates when our data does, and credits Whirrwork. The card itself is in English.

<iframe src="https://whirrwork.com/embed/job/vegetation-management-lidar/" width="100%" height="340" style="border:0;max-width:520px" loading="lazy" title="Utility vegetation management (LiDAR): prices with receipts (Whirrwork)"></iframe>

Or embed the price chart

Every receipt behind the range, one bar per published price, with the source line drawn into the image. Use the iframe for clickable sources, or the image code for newsletters, slides and Markdown. The chart is in English.

Iframe (sources clickable)
<iframe src="https://whirrwork.com/embed/job/vegetation-management-lidar/chart/" width="900" height="344" style="border:0;width:100%;max-width:900px;height:auto;aspect-ratio:900/344" loading="lazy" title="Utility vegetation management (LiDAR): price chart with receipts (Whirrwork)"></iframe>
Image (HTML)
<a href="https://whirrwork.com/use-cases/vegetation-management-lidar/"><img src="https://whirrwork.com/embed/job/vegetation-management-lidar/chart.svg" width="900" height="344" style="max-width:100%;height:auto" alt="Chart of 2 sourced prices for Utility vegetation management (LiDAR) (EUR / corridor): from €900 to €5,000, newest dated Sep 22, 2026. Source: Whirrwork, CC BY 4.0."></a>
<p>Chart: <a href="https://whirrwork.com/use-cases/vegetation-management-lidar/">Whirrwork</a>, CC BY 4.0. Sources linked on the page.</p>
Markdown
[![Chart of 2 sourced prices for Utility vegetation management (LiDAR) (EUR / corridor): from €900 to €5,000, newest dated Sep 22, 2026. Source: Whirrwork, CC BY 4.0.](https://whirrwork.com/embed/job/vegetation-management-lidar/chart.png)](https://whirrwork.com/use-cases/vegetation-management-lidar/)

All embeds, charts and badges

Want real numbers for your job?

One form. We match you with providers who cover your country and forward it. Free.

Request quotes for utility vegetation management (lidar)